Mohammad Walid

Strategy and product leader, building systems and ecosystems for AI and new technology. From an emerging market to global scale. ex-Founder · ex-Amazon.

Agent view: the full portfolio as plain text, for AI agents, recruiters' tools and search. Markdown version: llms-full.txt. Human site: home.

Summary

Built a startup, A.R.I.E.S., that created National Instruments' market in Pakistan (2012–2019) → Program Manager, Penn State Nittany AI Alliance (2020–2021) → Senior Operations Manager, Amazon, leading 30+ managers (2021–2025) → Senior Manager, CI · Direct-to-Consumer Domain Lead, ShipMonk, owning a ~$90–95M annual-revenue domain across 12 buildings (2025–2026).

Generalist operator across strategy, operations and product; founder background; B2B and enterprise customers; cross-functional leadership. At Amazon also owned product operations for vision pilots (returns and freight-type classification; camera confirmation at sorter diverters through a peak event).

Looking for: Leadership roles in strategy or product, in AI and AI-enabled technology.

Role families: Chief of Staff (CoS) / Founder's Office · Strategy & Operations (S&O) / Business Operations (BizOps) · GTM Strategy & Operations · Product Operations · Product Management (PM) · Technical Program Management (TPM) · AI Deployment / Deployment Strategy · Special Projects / Strategic Initiatives

Basics

Location: Riverside, CA (Pacific time). Email: mohammad_walid@hotmail.com. LinkedIn: https://www.linkedin.com/in/mohammad-walid. Education: MBA, Penn State Smeal College of Business (2021); B.S. Computer Science, COMSATS University Islamabad (2013). Experience: 2012–2026 across founder, program, operations and product leadership. Résumé PDF: /resume/Mohammad_Walid_Resume.pdf.

Building National Instruments' market in Pakistan: go-to-market and ecosystem

A.R.I.E.S. (technology startup) · 2012–2019 · Open the case · Lenses: Strategy, Leadership & Transformation

Building a market, then making the technology useful through funded laboratories, trained practitioners, research partnerships and industrial deployment.

Context
In 2012 I built a startup, A.R.I.E.S., to bring advanced test, measurement and control technology into Pakistan. National Instruments, a Texas-based test and measurement company, had one person covering Pakistan, serving a single existing account. Outside that niche the market was greenfield: academic, research, industrial and government projects across Pakistan, with clear gaps.
What happened
Pakistan had huge inertia for new technology. The demand was there, but three barriers held it back: access, getting the technology functional, and people who could use it. The go-to-market had to work on all three, not just sell hardware.
What I led
NI's go-to-market for Pakistan, end to end, through a local import partner, a local engineering partner and NI's own teams. 50+ proposals to funders such as ADB and USAID, and the lab designs.
What lasted
NI assigned its own lead to run the market. Four Centers of Excellence and a LabVIEW academy (250+ certifications) kept producing trained users, and at least four major clients kept coming back with harder problems.

Results

Evidence for: GTM Strategy & Operations, Strategy & Operations (S&O) / Business Operations (BizOps), Chief of Staff (CoS) / Founder's Office, Special Projects / Strategic Initiatives

Keywords: Go-to-market, Market entry, Ecosystem building, Segmentation, Business development, Technology adoption, go-to-market strategy, market entry, emerging markets, 0 to 1, founder, startup, built a market from zero, business development, partner ecosystem, channel strategy, partnerships, funding strategy, market mapping, segmentation, ICP definition, pipeline building, proposal writing, donor and development funding (ADB, USAID), multi-year public budgets, public sector, higher education, research institutions, technology adoption, customer enablement, training and certification, supply chain, procurement, import logistics, contract management, product operations, technical solution design, stakeholder management, executive relationships, National Instruments, LabVIEW, test and measurement, instrumentation, $3M+ a year against a $1M target, new-market strategy, ICP segmentation, repeatable GTM launch, territory and account planning, B2B and public-sector accounts, account strategy, technical demos, customer discovery, customer validation, commercial expansion, first operator, founding hire, generalist

National testing labs: from a campus power audit to a provincial energy agency

A.R.I.E.S. (technology startup) · 2014–2018 · Open the case · Lenses: Strategy, Leadership & Transformation

A campus power audit, the same method in public buildings, then the certification regime and testing labs for a new energy agency.

Context
From 2014 to 2018, through my startup, I worked with a couple of educational institutes to build domain-specific Centers of Excellence. The country was suffering 12 to 16 hours of load shedding a day, and a new government energy-efficiency agency was in the works.
What happened
I partnered with the institutes to develop the technical delivery structure and solutions of the Centers of Excellence. One of these became the hub where I worked with the institute to develop a low-cost power auditing and smart load-balancing solution. The solution was then used to audit several government buildings and the burn unit of a hospital. After I met the head of an upcoming provincial agency, PEECA, these projects became the basis of a working relationship, and I partnered with PEECA on certification benchmarking and the testing laboratory designs.
What I led
The audit method and campus pilot with an early-stage partner and student developers, then the hospital and government audits. At PEECA: the certification benchmarking, the technical side of the regime, the lab designs with the NI team, and business development with the agency's incoming head, including the first conferences and technical proposals.
What lasted
Three national testing labs, designed on National Instruments technology, since built.

Results

Evidence for: Strategy & Operations (S&O) / Business Operations (BizOps), Special Projects / Strategic Initiatives, Technical Program Management (TPM), AI Deployment / Deployment Strategy

Keywords: Public-sector strategy, Policy and standards, Lab design, Energy efficiency, Stakeholder management, government partnerships, public agency, policy advice, certification regime benchmarking, standards, compliance, energy audit, power factor correction, load balancing, testing infrastructure, lab design, test methods, calibration, safety requirements, procurement specifications, business case, physical systems, hardware, national testing labs, UPS, LED and battery testing, cross-sector stakeholders, standards and certification, regulatory benchmarking, government relations

Transformer test automation at a national testing facility

A.R.I.E.S. (technology startup) · 2015–2017 · Open the case · Lenses: Product & Platforms, Applied AI & Decision Systems

Automating high-voltage transformer testing at one of the country's two national facilities, through factory and site acceptance.

Context
Transformer testing at one of the country's two national transformer testing facilities ran by hand, including discharging with a 10-foot pole. The university also held NI hardware it wasn't using.
What happened
I treated measurement, test sequence, discharge and safety as one system, built on hardware the university already owned. Automated sequencing, interlocks and automatic discharge replaced the manual steps, including discharging with a pole, and the bench went through factory and site acceptance and technology transfer.
What I led
Solution definition and partner coordination for transformer test automation at one of the country's two national transformer testing facilities: the measurement and control architecture, test sequencing, calibration checks, safety interlocks and controlled discharge, through factory and site acceptance and technology transfer. The facility and specialist teams handled the physical deployment.
What lasted
An accepted test-automation capability, handed over to the facility through technology transfer.

Results

Evidence for: Technical Program Management (TPM), AI Deployment / Deployment Strategy, Product Management (PM)

Keywords: Test automation, Hardware-in-the-loop, Safety systems, Acceptance testing (FAT/SAT), Systems integration, control systems, real-time systems, LabVIEW, NI RIO, instrumentation, data acquisition, industrial automation, high-voltage testing, interlocks, lockout/tagout, calibration, requirements definition, solution architecture, partner coordination, factory acceptance testing, site acceptance testing, technology transfer, deployment, mission-critical systems, hardware/software co-development, test engineering, rapid prototypes, manufacturing test

Nittany AI Alliance: building the AI delivery function

Penn State · Nittany AI Alliance · 2020–2021 · Open the case · Lenses: Product & Platforms

Turning an AI lab's informal client work into a delivery function: intake, planning, client reviews and handover across three programs.

Context
The Nittany AI Alliance at Penn State had talented developers and real clients, but no delivery function. Client knowledge lived with the director and a departing program manager, and projects ran on chat threads and a shared document.
What happened
I took over the full client-to-delivery lifecycle: intake and scoping, sprint planning across three programs, bi-monthly client reviews, and acceptance and handoff. I coached the developers to present their own work to clients, so the program no longer depended on one spokesperson, then helped hire a permanent program manager and handed it over.
What I led
The Alliance's delivery program as its only program manager under the director: 12 developers across three client programs.
What lasted
A repeatable delivery structure, developers presenting to clients on their own, and a permanent program manager I helped hire and handed the program to.

Results

Evidence for: Technical Program Management (TPM), Chief of Staff (CoS) / Founder's Office, AI Deployment / Deployment Strategy

Keywords: Program management, Delivery operations, Client governance, Team building, Applied AI delivery, AI/ML solution delivery, intake, scoping, sprint planning, agile, client management, stakeholder updates, acceptance, handoff, hiring, coaching, building a function from scratch, university-industry partnership, 12 developers, three programs, PMO, portfolio delivery, program planning, resourcing and utilization, client delivery, delivery cadence, AI program management, university–industry delivery

Penn State donor system: ML outreach built on how relationships work

Penn State · Nittany AI Alliance · 2020–2021 · Open the case · Lenses: Product & Platforms, Applied AI & Decision Systems

Product and delivery for an alumni and donor engagement system that is still in use at Penn State.

Context
Penn State's alumni and donor teams didn't need a ranked list of likely donors. They needed outreach that respected how relationships work: who owns each relationship, how recently someone was contacted, and what kind of outreach fits.
What happened
Instead of shipping a donor score, I turned the outreach team's practice into rules the model couldn't override: relationship ownership, contact cadence and outreach type. I ran the intake, the reviews of model and rule behavior, testing and the user workflow, and brought my successor into the client history so the system kept running.
What I led
Product and delivery: communication intake, sentiment analysis, donor classification and the marketing MLOps workflow, integrated into the university's outreach work. Faculty owned the models.
What lasted
The alumni and donor system is still the solution in use at Penn State.

Results

Evidence for: Product Management (PM), AI Deployment / Deployment Strategy, Product Operations

Keywords: Applied ML, Product delivery, Decision rules, MLOps, Deployment and adoption, product management, ML product, sentiment analysis, classification, NLP, outreach, guardrails, requirements, user workflow, deployment, documentation, still in use, higher education, donor intelligence, stakeholder adoption, AI deployment, workflow discovery, solution design, configuration, launch and adoption, measurable impact, deployment strategy, customer workflow

ML testing environment for flight ops: recovering a grounded program

Penn State · Nittany AI Alliance · 2020–2021 · Open the case · Lenses: Product & Platforms, Applied AI & Decision Systems

When wildfires grounded an aerospace sponsor's LiDAR flights, the program moved to simulation instead of waiting.

Context
An aerospace sponsor's model-testing program depended on drone LiDAR flights. California's wildfires grounded them, and waiting meant losing the program.
What happened
When the wildfires grounded the drone LiDAR flights, I moved the program to simulation instead of waiting. We built two environments in Blender and Maya with virtual LiDAR in AirSim, and tested path planning and classification of six element types against them. I ran weekly sponsor reviews and was clear that field performance still needed real flights.
What I led
Recovery, scope and delivery for an aerospace sponsor's model-testing program, across simulation, scenes and LiDAR, and the models.
What lasted
A model-testing environment that no longer depended on flights, handed over with the program.

Results

Evidence for: Technical Program Management (TPM), AI Deployment / Deployment Strategy, Product Management (PM)

Keywords: Simulation, Program recovery, LiDAR and perception, Sponsor management, Model testing, digital twin, AirSim, Blender, Maya, virtual LiDAR, point cloud, path planning, object classification, computer vision, evaluation, validation boundaries, aerospace, dependency management, weekly governance, risk management, synthetic data, sensor data, data operations, test scenes, robotics and autonomy testing, dataset quality

Amazon hybrid sorter: a live retrofit through Prime Day

Amazon · 2022–2023 · Open the case · Lenses: Strategy, Leadership & Transformation

Leading an $11M hybrid-sorter retrofit in a building that kept shipping, through Prime Day and the network's decision on the design.

Context
An $11M hybrid-sorter retrofit at my Amazon site, one of four pilots. The building had to keep shipping through eight months of construction in four phases, with 30% to 60% of the floor unavailable. The end of the project coincided with Amazon's second-highest volume event, Prime Day.
What happened
The end of construction ran into Prime Day, and the plan assumed the building would go straight back to its normal peak target. I modeled the whole chain instead: demand, the planned execution for each construction phase, and actual execution on the floor. With planning, Finance and the project stakeholders I built three scenarios from those models. They showed what a shortfall here would do to the other buildings in the region, which were already near their limits: a modeled loss of about $12M a day. I took them to VP level and got approval to run to a realistic target and take extra freight where it helped the region.
What I led
I led the project at my site: the S&OP, freight and inventory management, and the execution plan through eight months of construction, then the Prime Day plan and the operating changes after launch. I owned the operating side, not the sorter's engineering design.
What lasted
The construction playbook went to other buildings, and I trained peers in two of them. Mine was the only one of the four pilot sites to deliver its high-volume event. The network decided against the hybrid design, and no other buildings got it.

Results

Evidence for: Strategy & Operations (S&O) / Business Operations (BizOps), Technical Program Management (TPM), Chief of Staff (CoS) / Founder's Office, Special Projects / Strategic Initiatives

Keywords: Executive escalation, Scenario modeling, S&OP, Program leadership, Risk management, Network planning, VP-level decision, capital project, $11M program, change management, construction phasing, capacity modeling, demand planning, sales and operations planning, inventory management, playbook, SOPs, peak readiness, Prime Day, risk quantification, ~$12M/day modeled exposure, Finance partnership, cross-functional, pilot evaluation, scaling decision, telemetry, automation retrofit, robotics and automation hardware, cost improvement, throughput, network operations, integrated operating plan, deployment capacity, special projects, hardware/software program, milestones and dependencies, decision follow-through, scenario planning, capacity planning, budget, PMO

Amazon ML planning platform: alpha testing before live operations

Amazon · 2023–2024 · Open the case · Lenses: Product & Platforms, Applied AI & Decision Systems

Alpha testing an ML extension of Amazon's planning platform, and turning its failures into requirements for the next version.

Context
Amazon's next planning platform brought ML-driven parameters into order prioritization and shift planning, so a building could control how much work it invited and how multi-order work was processed. It needed operational alpha testing at two sites before live use.
What happened
I built realistic parameter and workflow stress cases from how my site actually planned and ran shifts, and found two failures: scheduled headcount was being treated as usable capacity, and eligible work could be locked into manual batching before the shift could prioritize it. I held the high-volume test until the planner met its qualification criteria, even though the schedule wanted it sooner, and took both failures to the product team with fixes: precedence rules, adjustment bands with approval, and separating allocation from override permission.
What I led
Operational alpha testing at my site and the release recommendation. The central engineering and data-science team owned the planning engine; I owned testing and operating feedback.
What lasted
Two validated failure modes went back to the product team as requirements for its next version, and I led the first waves and wrote the playbook for retiring centralized planning in a second network.

Results

Evidence for: Product Management (PM), AI Deployment / Deployment Strategy, Product Operations, Technical Program Management (TPM)

Keywords: ML product testing, Product requirements, Release gating, Decision-authority design, Launch criteria, alpha testing, user acceptance testing, product feedback, failure modes, human-in-the-loop, override design, guardrails, ML deployment, AI deployment, planning systems, order prioritization, capacity, labor planning, qualification criteria, launch readiness, partnership with engineering and data science, decision systems, operational risk, evals, evaluation criteria, deployment gates, cross-functional risk reviews, model launch readiness, operational readiness, rollout measures, safety and guardrails, alpha program

Manager readiness: an eight-week path adopted by up to eight sites

Amazon · 2021–2024 · Open the case · Lenses: Product & Platforms

Manager onboarding rebuilt around running the operation.

Context
Standard manager onboarding at Amazon was handovers and slide decks. It didn't teach the daily cadences, technical mechanics or cross-functional relationships a manager needed to run a shift alone.
What happened
I rebuilt onboarding for my own managers as an eight-week readiness path: four Wednesdays with every department, the full building flow whatever their home department, and a practical readiness check around day 60, judged on decisions observed on the floor rather than completed coursework. It started with nine managers and spread to up to eight sites.
What I led
Built the eight-week readiness path: cross-department rotations, visible decision checkpoints, safety audits and coaching loops.
What lasted
Up to eight sites adopted it as their primary manager onboarding.

Results

Evidence for: Chief of Staff (CoS) / Founder's Office, Strategy & Operations (S&O) / Business Operations (BizOps)

Keywords: Leadership development, Enablement, Training design, Adoption across sites, onboarding program, manager development, curriculum design, certification, coaching, cross-functional rotations, safety audits, scaling a program, learning and development, people leadership, up to eight sites, operational readiness, technical enablement, training at scale, onboarding, multi-site rollout

The D2C operating platform: one source of truth for 12 buildings

ShipMonk · 2025–2026 · Open the case · Lenses: Product & Platforms, Applied AI & Decision Systems

Planning, live execution, quality and reporting for ShipMonk's D2C domain in one platform, built with Product and Data.

Context
Operators had no single source of truth. There was no internal tool for live dashboards, so they used Metabase and the ShipMonk app, HR ran on a separate platform, and nothing existed for shift planning or tracking. About half the metrics weren't reported, including subprocess cycle time.
What happened
I started with the shift planner and made it the standard in every building. Then, with Product and Data, I rebuilt the planning math, built subprocess cycle time up into bottom-up labor planning, and brought live execution, quality alerts and photo confirmation into one platform. Operations leaders used the same cycle times for continuous improvement. It replaced four to five separate sheets and calculators, and the operating model moved beyond its pilot.
What I led
With Product and Data: business logic, data lineage, definitions, requirements, operator workflows and adoption across 12 buildings, with the AI-assisted operations layer on top.
What lasted
The operating model moved beyond its pilot and was centralized, with one platform for operational tooling being adopted across the 12 buildings and the remaining domains as extensions. Every building moved from its own calculator to one shift planner.

Results

Evidence for: Product Operations, Product Management (PM), Strategy & Operations (S&O) / Business Operations (BizOps), AI Deployment / Deployment Strategy

Keywords: Product ownership, Operating platform, Data modeling, Requirements and rollout, AI-assisted operations, Adoption at scale, product management, product operations, internal tools, platform, single source of truth, data lineage, business logic, requirements, roadmap, prioritization, Sigma, Snowflake, data marts, SQL, analytics, KPI design, metrics, workforce management, capacity planning, demand forecasting, shift planning, staffing, staffing manager, labor planning, real-time telemetry, quality alerts, retrieval-augmented generation (RAG), AI assistant, access control, change management, rollout, training, cross-functional with Product and Data, multi-site deployment, 12 buildings, direct-to-consumer, operator decisions 70% faster, workforce planning, launch readiness, customer and operator feedback into product decisions, issue triage, lightweight automation, internal AI tooling, workflow automation, AI-native operations, baselines and evaluation criteria, implementation, adoption and measurable value, enterprise rollout

ShipMonk D2C ownership: a $90–95M business, process and product

ShipMonk · 2025–2026 · Open the case · Lenses: Strategy, Leadership & Transformation

Owning the direct-to-consumer domain across 12 buildings in a role that had not existed: planning, the processes, the reviews, launches and merchant quality.

Context
ShipMonk's D2C business ran across 12 buildings at about $90–95M in annual revenue, and no role like mine existed. Shift planning didn't exist, labor planning wasn't built from demand in any structured way, only a sheet, and documentation didn't match newer workflows like photo confirmation and batching.
My role
D2C domain owner, with ownership spanning process, product, technical and C-suite reporting, as well as future solutions and designs.
What I led
The D2C domain end to end, including the full product: internal tooling, the order management side of the ShipMonk app, and every KPI and metric. Planning, launch readiness, SOP and RCA mechanisms, merchant escalations, and the WBR, MBR and QBR I designed, ran and presented to the CEO, CFO, CTO, CSCO and CPMO.
What lasted
One set of KPI definitions from the floor to the C-suite, documented processes that matched execution, managers trained to read the system, and a planning and reporting model that was centralized, with the remaining domains as extensions.

Results

Evidence for: Chief of Staff (CoS) / Founder's Office, Strategy & Operations (S&O) / Business Operations (BizOps), Special Projects / Strategic Initiatives

Keywords: Domain ownership, Executive reporting, Operating cadence, KPI design, Business reviews (WBR/MBR/QBR), business owner, $90–95M annual-revenue domain, general management, WBR, MBR and QBR, C-suite communication, operating rhythm, operating model, SOPs, root cause analysis, escalation management, launch readiness, customer experience, merchant escalations, cross-functional leadership, technology transformation committee, AI adoption, documentation, training program, process re-engineering, metric definitions, strategic planning, process design, planning cadence, goal-setting and OKRs, metrics cadence, executive decision support, cross-functional operating mechanisms, business operations (BizOps), strategy and operations (S&O), B2B customers (merchants), post-sales operations, customer escalations, headcount and capacity planning

The Aisle Tax

ShipMonk · 2025–2026 · Open the case · Lenses: Strategy, Leadership & Transformation

A building launch in my D2C domain turned into evidence that changed an approved facility design at three planned sites.

Context
Site 1 was a building launch in my D2C domain, and I was there to make sure the process could run and people were trained. A manager told me pickers were hitting constraints in the narrow aisles and work was getting slower. The narrow-aisle design had already been approved to add storage and was moving through the facility program.
What happened
Active construction was underway at the first of three planned buildings. I built the evidence from production telemetry, matched workloads across the two buildings so the work was comparable, and ran same-picker trials across shelf setups. I took it to my manager, the Chief Supply Chain Officer, who brought in the CEO. The next step was live model experiments, and their results became a design change for the three planned sites, including a retrofit of the one under active construction.
What I led
Data collection, data modeling, telemetry and process modeling, the picker experiments, executive reporting and the updated design, alongside my domain's launch readiness at Site 1. I had no capital-approval authority.
What lasted
Designs changed at three planned sites: Site 2 under active construction, and Sites 3 and 4 before construction began.

Results

Evidence for: Strategy & Operations (S&O) / Business Operations (BizOps), Chief of Staff (CoS) / Founder's Office, Special Projects / Strategic Initiatives

Keywords: Experiment design, Executive influence, Facility economics, Telemetry analysis, Business case, CEO decision, changing an approved decision, controlled trials, matched comparison, SQL, causal caveats, cost modeling, capital expenditure, design change, facility design, process modeling, data modeling, evidence-based decision making, launch readiness, executive reporting, 756K pick events, business case, ROI, cost-to-serve, quantitative analysis, decision memo, strategic analysis, labor economics

Photo confirmation: a paid merchant service at ShipMonk

ShipMonk · 2025–2026 · Open the case · Lenses: Product & Platforms, Applied AI & Decision Systems

Packaging and kitting escalations turned into photo confirmation on every pack station, switched on per SKU for merchants and internally for packaging issues, and launched as a paid merchant service.

Context
Packaging quality and kitting escalations kept coming from merchants, and there was no visual record of what left the building.
What happened
Photo confirmation came out of packaging and kitting escalations. I set it up on every pack station so any workflow could be switched on: per SKU for merchants, and internally for packaging and workflow issues. I offered it first to one heavy-kitting merchant and launched it as a paid service merchants could use as evidence.
What I led
Product and operations for photo confirmation as D2C owner: the service model (which SKUs and stations, what the camera captures, how merchants see each photo) and the paid launch.
What lasted
A paid service, $100K across two quarters with three merchants. The vision questions it raised continue in the AI Lab.

Results

Evidence for: Product Management (PM), Product Operations, GTM Strategy & Operations

Keywords: Service launch, Visual evidence, Quality, Customer experience, Monetization, value-added service, paid service, customer evidence, escalation reduction, camera capture, product launch, pilot customer, kitting, quality assurance, human-in-the-loop, vision research follow-on in the AI Lab, $100K in two quarters, every pack station, per-SKU switch, commercialization, packaging and monetization of a service, customer pilot, B2B

Research partnerships

A.R.I.E.S. (technology startup) · 2012–2019 · Open the page

Through the startup, four Centers of Excellence and a LabVIEW academy (250+ certifications) behind the NI market, and the research platforms built on them: a flight-tested airship (papers 2014–2025), a Massive MIMO platform, an assistive wheelchair (NI Asia award) and a robotic bowling arm.

Keywords: Centers of Excellence, academic partnerships, research platforms, Massive MIMO, 5G research, airship, remote sensing, thermal imaging, assistive technology, multimodal input, robotics, mechatronics, FPGA, myRIO, LabVIEW academy, 250+ certifications